How long does it take for a self-leveling floor to dry under laminate?
Laminate is a common and popular covering option that requires a specific base for its installation. If all the necessary conditions for operation are not met, then its service life is reduced. For example, the quality of laminate does not depend on the quality of repair work.
The content of the article
How long does it take for a self-leveling floor under a laminate to dry?
When using laminate, owners may encounter many problems:
- the appearance of a squeak;
- divergence of boards;
- swelling;
- unevenness;
- deformation.
All these problems can arise due to the use of thick substrates, as they can become deformed over time. Their use is due to the fact that such a layer is chosen as a leveling layer. This is the most common problem.
When laying tiles, a smooth surface is achieved by applying a special adhesive. There is an opinion that laminate can be laid with glue, using a backing. Laying this material requires a reliable, uniform surface during its service life. To do this, the surface can be leveled using the pouring method.
Help: It should be noted that the laminate can withstand a base difference of 2–3 mm per square meter. m.If the base was not ready, then at maximum drop parameters the mechanisms are affected by certain factors.
When choosing a suitable floor, you should pay attention to:
- width;
- length;
- the dimensions of the room in which the repair work will be carried out. Usually, many people pay attention to the difference in height and fill. The choice of gender will depend on these factors. For example, if you have made the necessary measurements, it is recommended to select a suitable solution according to certain parameters:
- composition;
- drying period;
- shrinkage percentage;
- filling thickness.
Typically, the solution is selected according to the thickness of the fill. There are different types of flooring intended for finishing. These types of filling are used in supermarkets, restaurants, cafes, and many public places. They are covered with various coatings made from different materials.
The cost depends on the mixture chosen. Mixtures may vary in composition and cost. When they contain plasticizers, the solution is better leveled. A thickness of 2-5 mm for laminate is optimal.
How long does it take for different types of self-leveling floors to dry?
To find out the period of work to create a base in the form of a self-leveling floor for the material, you should find out how long it will take to dry, if after pouring it is possible to lay the coating. Everyone knows that after pouring, laying the coating is difficult.
Laminate flooring will remain in good condition throughout the entire period of use if it is laid on a special, flat surface. One of the best methods for laying this surface is the pouring method. This coating is obtained by laying the solution in a liquid state, under the influence of gravity, on the finished base.
After the special solution dries, a flat, smooth surface is obtained; it is used as a substrate for the selected coating material.
What to do to make the self-leveling floor dry faster
The drying period will depend on:
- by type;
- its composition;
- room temperature;
- humidity.
When using cement mortars, laying should be done no later than every other day. After the period of one week has expired, you can step on the floor and remove debris from it. When drying has occurred, the shade may change from dark to light, and you can begin laying the laminate on the surface.
Basically, the self-leveling floor dries out after 3 weeks. Much depends on air humidity and heating in the room. When using quick-drying cement, the period of work may shift, becoming 7–9 days faster.
Important: If solutions with components in the form of polymer resins are used, the drying period will be -3–47 hours. At the same time, good floors are obtained when acrylic resins are used, their drying time is 3–5 hours. For surfaces made of polystyrene or polyurethane, this period maybe 10–12 hours.
When using a composition based on epoxy resins, a longer curing process is required - up to 2 days. Drying time will depend on the room temperature and the material used. Such surfaces are resistant and durable to environmental influences; they are used in various production environments, in hospitals, and industry.
When making a floor in several stages, any layer must be applied if the previous one is completely dry. The drying period can be calculated by multiplying the number of layers by the period of production of one layer.