Geyser Vector: instruction manual

image002-2

creativecommons.org

Water heaters from this company have proven themselves quite well in the market for such devices. That is why we decided to prepare an article with instructions for the Vector gas water heater, so that everyone can find information about maintaining the system.

Gas water heater device Vector

Any model of the company’s gas burner has the following components:

  • The main component, without which the operation of the device is impossible, is a copper heating element. This is a large number of small tubes through which cold water is supplied. Under the influence of a gas burner on the surface of the pipe, the system heats up all the liquid and discharges it to the mixer.
  • Vector speakers have electric ignition. This is why working with such equipment is many times safer than an open fire: the latter always has an active flame, and it does not stop.
  • The gas supply unit begins to operate after opening a special valve. This is a self-regulating system that does not work without water flow. This is the safety of the gas burner - replace the valve in time so that it works fully.
  • The mixture for the gas burner is supplied in a special chamber. It is connected to a steel outlet pipe. There is a sensor inside that turns off the system if there is no water.
  • Another thermostat is designed to protect the device from overheating. It is installed at the point of the highest temperature - in the center of the heat exchanger.When the temperature reaches 80 Celsius, the device automatically turns off.

How to turn on the geyser Vector

The first stage is installing batteries for electric ignition. To do this, open the battery compartment and install the batteries according to the required polarity.

Then open the tap for cold water and gas supply, as well as the nearest hot water faucet. Under the spark from the batteries, the burner begins to work. If nothing happens, actively open/close each tap several times.

If the burner lights up properly, turn the water vapor control valve to the right. This will activate the Vector gas heater system and produce hot water.

Geyser Vector - operating instructions

The device can and should be installed in any non-residential premises where there is heating. The volume of the room must be at least 8 cubic meters. There definitely must be ventilation or a place for ventilation, since the burner processes oxygen for operation. In addition, a separate chimney will be required.

The installation itself is carried out by gas service specialists and only with the permission of the gas workers, otherwise they may be forced to remove the device and prohibit its use.

The hanging system is installed exclusively on a wall covered with galvanized metal, or made of fireclay bricks (not destroyed at high temperatures.

Water should be connected to the heater through a separate filter. At the first start, slightly cloudy water will flow, but this is not critical - all waste is drained and the system restarts. After clear liquid has flowed out, you can begin to actively use the gas water heater.

Comments and feedback:

Washing machines

Vacuum cleaners

Coffee makers